User studies: When an install fails, still seeing a status of "installing"
@jtlong3rd is already working on this.
Since Aug 31, 2022.
Assessment
This issue has not been assessed yet.
Description
See slack thread: https://epvb.slack.com/archives/CBEA7PQDQ/p1657045518138049
Basically, I tried to upload the PRISM_cohort_Participants.txt file as a user study. I received no error message on import or install, but even though the logs showed the install failed within a few min, 40 min later I still saw the status as "installing". This ticket is specifically to address the bug where an install failed but was not reported as a failure.
- Dominant language
- Java
- Stars
- 1
- Forks
- 4
- Avg merge
- 1m
- Merged PRs (30d)
- 1
Getting set up
- Ships a Dockerfile or Docker Compose file
- No pull request template
- No contributing guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from VEuPathDB/WDK
-
Difficulty 3/5 1-2 days Newbie friendliness 62/100
-
Difficulty 4/5 3-5 days Newbie friendliness 38/100
-
Difficulty 4/5 3-5 days Newbie friendliness 35/100
-
Feature request: Add redirectUrl query parameter support to `/service/logout` endpointPossibly taken A pull request linked to this issue is open or already merged. Openenhancement
Difficulty 3/5 1-2 days Newbie friendliness 42/100
-
Refine login API to get rid of cookies and automatic guestsPossibly taken @ryanrdoherty claimed this 685 days ago. Open
Similar issues
-
BoxAttachmentMulti parsing leaks IOException / ArrayIndexOutOfBoundsException on malformed content instead of IllegalArgumentExceptionPossibly taken @Kshot3000 claimed this today. Open
Difficulty 2/5 1-3 hours Newbie friendliness 74/100
ergoplatform/ergo-appkit#272 ·
-
Difficulty 2/5 1-3 hours Newbie friendliness 64/100
-
Difficulty 2/5 1-3 hours Newbie friendliness 66/100
-
Difficulty 2/5 1-3 hours Newbie friendliness 64/100
utopia-rise/godot-jvm#1004 ·
Maintainers usually reply within 1 day
-
Difficulty 2/5 1-3 hours Newbie friendliness 82/100
spring-projects/spring-grpc#442 ·