P3 push-start: cryptoeconomic mechanism design tracking (staking, slashing, auditing, scoring, rewards, fees/treasury, tokenomics)
Maintainers usually reply within 1 day
Nobody has claimed this yet.
Assessment
- Difficulty
- 5/5
- Estimated time
- Over a week
- Newbie friendliness
- 28/100
- Issue type
- Feature
- Clarity
- Mostly clear
- Activity status
- Quiet
- Tech stack
- python, solidity
- Domain
- blockchain
Research direction
Read Developer/design/MECHANISM_DESIGN.md §9, then compare the child issues #37–#43 with the sequencing in Developer/ROADMAP.md. Track unresolved decisions and record agreed outcomes in the design document; done when every child design is agreed, discussions are resolved, the child issues are on project board 6, and contract work can start from a frozen spec.
Written by the indexing model from the issue text.
Description
Why this issue exists
P4 (din-dao #23, din-sdk #20, din-daemon #21, din-indexer #24) is the currently active phase, but P3 — the cryptoeconomic layer — is delayed because finalized designs for its mechanisms do not exist yet: staking, slashing, auditing, scoring, rewards, network fees/treasury, and tokenomics. This is why project board 6 has been nearly empty while board 7 fills up.
The design groundwork now exists in-repo. This issue tracks the design push that unblocks P3: each child issue below must reach an agreed design (open decisions closed, discussion threads resolved) before its contracts/implementation work starts.
Canonical design sources
Developer/design/MECHANISM_DESIGN.md— consolidated DevNet 2.0 cryptoeconomic design: role × mechanism matrix, current on-chain state vs gaps, per-mechanism designs, and the §9 consolidated open-decision list.Developer/design/whitepaper-summary.md— summary of the DIN white paper (Abraham Nash, Jun 2026) with a gap/alignment checklist (§8) mapping paper mechanisms to DevNet status.Developer/ROADMAP.md— work packages P3-4.x (slashing), P3-SCR (scoring), P3-5.x (token utility / emission / fees), P3-6.x (testing/audit), P3-DOC2/3/5. Use the WP IDs for scope and sequencing; the week-by-week dates are not binding.
Child issues (one per mechanism)
- #37 — Staking: DAO-settable floor, per-model stake requirements, concurrent-registration cap, withdrawal queue
- #38 — Slashing: conditions taxonomy, penalty tiers, slashed-stake destination, dispute resolution (P3-4.1/4.2/4.3)
- #39 — Scoring: BlockFLow validation (P3-SCR), on-chain median, scenario-driven scoring redesign
- #40 — Auditing: auditor evaluation mechanism — commit-then-reveal, encrypted test data, deviation accountability
- #41 — Rewards: per-GI reward engine and pull-payment claim flow
- #42 — Tokenomics: token utility, emission schedule, supply policy, treasury (P3-5.1/5.2)
- #43 — Fees & treasury: fee lines, fee-router contract, DIN denomination (P3-5.3)
Decisions under discussion
The consolidated open-decision list is MECHANISM_DESIGN §9. The protocol-shaping ones are open as Discussions for input from @abrahamnash and the team:
- #44 — Slashing economics: slashed-stake destination, penalty sizing, dispute bonds, delegator semantics
- #45 — Tokenomics: emission schedule, MAX_SUPPLY, fee denomination, burn policy
- #46 — White paper ↔ DevNet alignment: delegation, encrypted test sets, resampling, commit-then-reveal, governance
Status update (2026-07-21): most of the above is now resolved — see the updated MECHANISM_DESIGN.md §9 and the corresponding notes on #37, #38, #40, #42, #43. Still open: reward split percentages, per-model stake bounds, dispute bond size/window, and the exact partial-slash fraction / S3 threshold (pending P3-SCR data).
Related backlog (design write-ups exist, not opened as issues yet)
Developer/issues/validator_selection.md— capability-aware validator selection (P3-adjacent, feeds staking/aggregation)Developer/issues/decentralized-governance.md— DAO migration of admin controls (P3 shipsonlyOwnergovernance hooks only; full DAO is later, ties into din-dao #23)
Definition of done
- Every child issue has an agreed design with its open decisions closed
- Discussion threads resolved and decisions recorded back into
MECHANISM_DESIGN.md - Child issues populated on project board 6
- Contract work can start against a frozen mechanism spec (pre-audit, per P3-6.3b)
- Dominant language
- Python
- Stars
- 4
- Forks
- 7
- Avg merge
- 4d 12h
- Merged PRs (30d)
- 36
Getting set up
This project ships no dev container, Dockerfile or contributing guide, so setting up is up to you: start from its README, and see our first-contribution guide for the general steps.
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from InfiniteZeroFoundation/DevNet
-
Update the 25 translated organisation READMEs to match the English versionPossibly taken @mrCabez claimed this 5 days ago. Opengood first issue help wanted
Difficulty 2/5 1-3 hours Newbie friendliness 76/100
InfiniteZeroFoundation/DevNet#277 · 3 comments · 1 assignee ·
Maintainers usually reply within 1 day
-
bug
Difficulty 3/5 1-2 days Newbie friendliness 45/100
InfiniteZeroFoundation/DevNet#309 ·
Maintainers usually reply within 1 day
-
bug python
Difficulty 4/5 3-5 days Newbie friendliness 52/100
InfiniteZeroFoundation/DevNet#306 ·
Maintainers usually reply within 1 day
-
DP: default noise_multiplier (σ = 5.0 at clipping_norm 10) reduces the reference model to chance accuracy once DP is enabledPossibly taken @umeradl claimed this 1 day ago. Open
Difficulty 5/5 Over a week Newbie friendliness 25/100
InfiniteZeroFoundation/DevNet#299 · 3 comments · 2 assignees ·
Maintainers usually reply within 1 day
-
Long run
Difficulty 5/5 Over a week Newbie friendliness 25/100
InfiniteZeroFoundation/DevNet#298 ·
Maintainers usually reply within 1 day
All issues in InfiniteZeroFoundation/DevNet
Similar issues
-
bump patch
Difficulty 2/5 1-3 hours Newbie friendliness 72/100
autowarefoundation/autoware_carla_scenario#1321 ·
Maintainers usually reply within 1 day
-
Difficulty 2/5 1-3 hours Newbie friendliness 72/100
Maintainers usually reply within 1 day
-
Difficulty 1/5 1-3 hours Newbie friendliness 78/100
QuantConnect/Documentation#2838 ·
Maintainers usually reply within 1 day
-
get_all_subclasses must deduplicate by class identityPossibly taken @Gambit-Checkmate claimed this today. Open
Difficulty 2/5 1-3 hours Newbie friendliness 68/100
Maintainers usually reply within 15 days
-
Difficulty 2/5 1-3 hours Newbie friendliness 70/100
awslabs/route53-dynamic-dns-with-lambda#67 · 1 comment ·