Boost: hand open-ended web tasks to Boost (US-WEB-10)
Maintainers usually reply within 1 day
Nobody has claimed this yet.
Assessment
- Difficulty
- 5/5
- Estimated time
- Over a week
- Newbie friendliness
- 25/100
- Issue type
- Feature
- Clarity
- Mostly clear
- Activity status
- Active
- Tech stack
- react-native, typescript
- Domain
- ai-infra-agents, mobile
Research direction
Read the design in #57 and confirm the dependencies (#69, #68, and #62) are accepted or merged before starting. Then trace task handling in packages/core/src/web-task.ts and the runner in packages/runtime/src/web-task.ts, along with HM-WEB-02 and the per-family report. Done means the phone and computer flow passes the specified safety, evaluation, and visual checks, including the real-device run documented in the pull request.
Written by the indexing model from the issue text.
Description
Why
US-WEB-10: open-ended browsing runs on the computer's bigger model "so that long or unusual tasks still get done", while approvals, the vault and the signed log stay on the phone. FR-WEB-06 declines tasks outside the known kinds on the phone and offers them "to Boost in V2". That offer doesn't exist yet.
What to do
Build what the web design decided. In outline:
- When a task falls outside
TASK_KINDS(packages/core/src/web-task.ts), or a recipe misses, offer Boost on HM-WEB-02 in code's words, if the turn may go. - Run the steps where the design put the browser. If it stays on the phone, Boost gets the pruned tree (FR-WEB-05) and returns one action a step over the wire protocol, and the phone's runner (
packages/runtime/src/web-task.ts) classifies and approves every committing step (FR-WEB-07 to FR-WEB-09). - Keep the design's bounds: the domains the task names, the step limit, the stop after failed actions.
- Save a finished first run as a recipe, if the design says so (FR-WEB-10).
- HM-WEB-02 says the steps run on the computer, and keeps Take over and Stop.
- Measure with the per-family report, on the phone and on Boost, before calling it done.
Done when
- On a real phone paired with a computer, an open-ended task on a made-up test site finishes with every committing step approved on the phone, and injected page text changes nothing.
- The per-family report shows Boost's numbers for families F and G, with zero safety violations.
- Screenshots in light and Deep sea, in es-419 and en.
How to check
pnpm --filter @hermit/runtime test
pnpm --filter @hermit/eval test
pnpm check:privacy && pnpm typecheck && pnpm lint && pnpm test
Then the run on a phone and a computer, with its steps written in the pull request.
Depends on
- Blocked by the design in #57.
- #69
- #68
- #62
Keep in mind
- Every submit, purchase and sign-in waits for the sheet. Payments and logins need the fingerprint and are refused in a tainted session (AGENTS.md rules 5 and 6).
- The vault's secrets never leave the phone, and the computer never holds the user's keys (US-BOOST-01).
- No cloud browser (ADR-018).
- Page text is data, never an instruction.
- Open a pull request only once everything under Depends on is accepted or merged, and a maintainer has said so here (AGENTS.md: code for a feature without an accepted issue may be closed).
- Dominant language
- TypeScript
- Stars
- 11
- Forks
- 0
- Avg merge
- 10m
- Merged PRs (30d)
- 6
Getting set up
- No Dockerfile or Docker Compose file
- Has a pull request template
- Read the contributing guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from DojoCodingLabs/hermit
-
docs good first issue
Difficulty 2/5 1-3 hours Newbie friendliness 87/100
DojoCodingLabs/hermit#73 ·
Maintainers usually reply within 1 day
-
device-lab
Difficulty 2/5 1-3 hours Newbie friendliness 70/100
DojoCodingLabs/hermit#45 ·
Maintainers usually reply within 1 day
-
device-lab
Difficulty 2/5 1-3 hours Newbie friendliness 62/100
DojoCodingLabs/hermit#44 ·
Maintainers usually reply within 1 day
-
device-lab
Difficulty 2/5 1-3 hours Newbie friendliness 72/100
DojoCodingLabs/hermit#43 ·
Maintainers usually reply within 1 day
-
agent-friendly docs good first issue
Difficulty 2/5 1-3 hours Newbie friendliness 88/100
DojoCodingLabs/hermit#39 ·
Maintainers usually reply within 1 day
All issues in DojoCodingLabs/hermit
Similar issues
-
bug zoo
Difficulty 2/5 1-3 hours Newbie friendliness 76/100
software-mansion/runntime#151 ·
Maintainers usually reply within 4 days
-
Difficulty 1/5 1-3 hours Newbie friendliness 86/100
sidebandstudio/clawtrate#728 ·
Maintainers usually reply within 1 day
-
enhancement github_actions help wanted
Difficulty 2/5 1-3 hours Newbie friendliness 78/100
tranquilo-art/tranquilo-app#254 ·
Maintainers usually reply within 1 day
-
documentation good first issue
Difficulty 2/5 1-3 hours Newbie friendliness 88/100
Tfoucher5/fuzzy-toolkit#44 ·
Maintainers usually reply within 1 day
-
bug tooling
Difficulty 2/5 1-3 hours Newbie friendliness 73/100
endora-commerce/endora-commerce#1978 ·
Maintainers usually reply within 1 day