[FEATURE]: Use official project logo (brand/logo.svg) on frontend site and keep new logo as proposal
Maintainers usually reply within 1 day
Assessment
- Difficulty
- 2/5
- Estimated time
- 1-3 hours
- Newbie friendliness
- 30/100
- Issue type
- Feature
- Clarity
- Clearly specified
- Activity status
- Stale
- Tech stack
- react, typescript
Research direction
Start with frontend/src/components/Header.tsx, frontend/index.html, frontend/public/brand/, and frontend/README.md; compare the current references with brand/logo.svg, brand/favicon.svg, and brand/Brand.md. Move the segment check assets into frontend/public/brand/proposal/ and update the site and README to identify the official logo as active. Done when the live site uses the official logo and favicon and the proposal assets remain preserved; linked pull request #349 is already open.
Written by the indexing model from the issue text.
Description
Summary
This is a follow-up to PR #265, as noted in the maintainer review by @ryoari:
The new logo in public/brand/ stays a proposal. The project logo is brand/logo.svg until we decide otherwise.
Problem
PR #265 introduced a proposed "segment check" logo in frontend/public/brand/ (logo-light.svg, logo-dark.svg, favicon.svg, app-icon.svg) and used it on the evidence site header and metadata.
However, the official project logo defined in brand/Brand.md is brand/logo.svg (the speech bubble with checkmark). Until the project formally decides on adopting a new brand mark, the frontend site should display the official project logo (brand/logo.svg) and favicon (brand/favicon.svg), keeping the new segment check mark as a proposal.
Proposed Solution
- Update the frontend site (
frontend/src/components/Header.tsx,frontend/index.html, andfrontend/public/brand/) to use the official project logo frombrand/logo.svgandbrand/favicon.svg. - Organize the proposed segment check assets in
frontend/public/brand/proposal/so they remain preserved as a design proposal without replacing the official project logo on the live site. - Update
frontend/README.mdto reflect thatbrand/logo.svgis the active project logo and the segment check assets are a proposal.
References
- Pull Request #265: https://github.com/AOSSIE-Org/OpenVerifiableLLM/pull/265
- Project brand guide:
brand/Brand.md
- Dominant language
- Python
- Stars
- 27
- Forks
- 72
- Avg merge
- 2d 19h
- Merged PRs (30d)
- 45
Getting set up
- No Dockerfile or Docker Compose file
- No pull request template
- Read the contributing guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from AOSSIE-Org/OpenVerifiableLLM
-
[BUG]: ovl.py verify --weights crashes with AttributeError on checkpoint .pt filesPossibly taken @Anurag1428 claimed this 1 day ago. Open
Difficulty 2/5 1-3 hours Newbie friendliness 84/100
AOSSIE-Org/OpenVerifiableLLM#387 · 1 comment ·
Maintainers usually reply within 1 day
-
[BUG]: verify_segment accepts empty, wrong-phase, or non-positive fork exclusions as MATCHPossibly taken @Arnav0107 claimed this 1 day ago. Open
Difficulty 2/5 1-3 hours Newbie friendliness 78/100
AOSSIE-Org/OpenVerifiableLLM#385 · 3 comments ·
Maintainers usually reply within 1 day
-
[BUG]: preparation.lock install fails on macOSPossibly taken @darshith2527-sketch claimed this 5 days ago. Open
Difficulty 2/5 1-3 hours Newbie friendliness 76/100
AOSSIE-Org/OpenVerifiableLLM#357 · 3 comments ·
Maintainers usually reply within 1 day
-
[BUG]: Forked runs omit timestamps for inherited chain entriesPossibly taken @pavithra-r06 claimed this 9 days ago. Openbug
Difficulty 2/5 1-3 hours Newbie friendliness 76/100
AOSSIE-Org/OpenVerifiableLLM#334 · 3 comments · 1 assignee ·
Maintainers usually reply within 1 day
-
[BUG]: review_ckpt.py passes a run that has .pt files no chain entry coversPossibly taken @arshil42 claimed this 9 days ago. Open
Difficulty 2/5 1-3 hours Newbie friendliness 84/100
AOSSIE-Org/OpenVerifiableLLM#332 · 4 comments · 1 assignee ·
Maintainers usually reply within 1 day
All issues in AOSSIE-Org/OpenVerifiableLLM
Similar issues
-
Difficulty 2/5 1-3 hours Newbie friendliness 86/100
bad-antics/lateralus-lang#1140 ·
Maintainers usually reply within 4 days
-
bug
Difficulty 2/5 1-3 hours Newbie friendliness 76/100
Maintainers usually reply within 3 days
-
fixture good first issue help wanted vendor:cisco
Difficulty 1/5 1-3 hours Newbie friendliness 85/100