480c: Stage 7 model/effort screen with Terra high
Maintainers usually reply within 1 day
Nobody has claimed this yet.
Assessment
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Newbie friendliness
- 15/100
- Issue type
- Feature
- Clarity
- Mostly clear
- Activity status
- Active
- Tech stack
- typescript
- Domain
- testing-qa
Research direction
Read the launch gates in this issue and the merged eval harness at PR #497, especially the launch configuration and single launch annex described here. Prepare the annex binding the 20 reused #485 captures, parity proof hashes, and one-signature limit; run one synthetic end-to-end test per arm and send the materials to architect-2 for review. Done means the launch check is complete before any live GET; the screen then pauses after slot 4 for the cost report and follows the stated stop conditions.
Written by the indexing model from the issue text.
Description
Status
In progress. PR #497 is merged as 796e59bb2888758d3919136ad3a50f886edb93e4 on master. The #480c launch configuration and single launch annex are next; no live calls have started.
Screen scope
Approved plan r2 1adb570f; $40 hard cap. Compare the product's default review behavior from f59a7e7 with Stage 7 using only openai/gpt-6.1-terra at high effort; no other models. Linked parent: #480.
The eval harness uses merged master 796e59b. I checked the merge diff: runtime changes are in the eval runner, and the only other src/ change is the EvalCase.llm.stages type declaration in src/types.ts. No product review pipeline, model-selection, provider or prompt behavior changed outside the eval-specific selection path, so 796e59b is suitable as the screen harness while f59a7e7 remains the product-behavior comparison.
Implementation and review record
PR #497 added per-arm eval llm config using product stageSelectionsSchema and product config precedence; derives expected calls from effective config; verifies effective Stage 7 model/effort from run evidence; retains physical-call checks; and rejects swapped arm/selection before database creation or transport. Fixtures cover precedence, identical Stage 5/9/10 wire requests across arms, Stage 7 differing only by model/effort, and swapped-arm refusal.
Reviewer approved exact head c8f62987e39af01f59582d77353a4c6154a5dfb6 against f59a7e7aafb7a61cd95b756fd0e6650ac7c05dab, with no findings. Focused suites (6 files / 523 tests) and diff check passed. Merge confirmed at 796e59bb2888758d3919136ad3a50f886edb93e4.
Launch gates and next step
lead-dev-2 prepares one launch annex binding the 20 reused #485 captures, parity proof hashes f78a561d, 40be4ac9, 89c21ca8, and the one-signature limit; runs one synthetic end-to-end test per arm; and sends the configs, annex and proofs to architect-2. architect-2 checks them before any live GET. lead-dev runs the screen, pauses after slot 4 to report Terra's actual per-review cost, and stops on any stock stop.
Readout: two independent blind graders, plan gates, stage-by-stage telemetry versus #485 A, and dollars per additional published cause-draw. No live calls before the synthetic tests pass and the launch check is complete.
- Dominant language
- TypeScript
- Stars
- 8
- Forks
- 1
- Avg merge
- 1h 24m
- Merged PRs (30d)
- 192
Getting set up
This project ships no dev container, Dockerfile or contributing guide, so setting up is up to you: start from its README, and see our first-contribution guide for the general steps.
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from 0xPolygon/codegenie
-
Difficulty 3/5 1-2 days Newbie friendliness 38/100
Maintainers usually reply within 1 day
-
bug stage7-harness
Difficulty 4/5 3-5 days Newbie friendliness 35/100
Maintainers usually reply within 1 day
-
stage7-harness
Difficulty 5/5 Over a week Newbie friendliness 5/100
0xPolygon/codegenie#480 · 1 comment ·
Maintainers usually reply within 1 day
-
bug stage7-harness
Difficulty 4/5 3-5 days Newbie friendliness 18/100
0xPolygon/codegenie#475 · 1 comment ·
Maintainers usually reply within 1 day
-
bug stage7-harness
Difficulty 3/5 1-2 days Newbie friendliness 22/100
0xPolygon/codegenie#472 · 1 comment ·
Maintainers usually reply within 1 day
All issues in 0xPolygon/codegenie
Similar issues
-
P3
Difficulty 2/5 1-3 hours Newbie friendliness 76/100
Maintainers usually reply within 1 day
-
bug L3 level 1 needs-review wocs
Difficulty 2/5 1-3 hours Newbie friendliness 84/100
SatyamPandey-07/WorkSphere#10739 · 1 comment ·
Maintainers usually reply within 1 day
-
maintenance
Difficulty 2/5 1-3 hours Newbie friendliness 83/100
assistant-ui/assistant-ui#10946 · 1 comment · 1 reaction ·
Maintainers usually reply within 1 day
-
clawsweeper:fix-shape-clear clawsweeper:queueable-fix clawsweeper:source-repro impact:auth-provider issue-rating: 🦞 diamond lobster no-stale P2
Difficulty 2/5 1-3 hours Newbie friendliness 76/100
openclaw/openclaw#206303 · 1 comment · 1 reaction ·
Maintainers usually reply within 1 day
-
Difficulty 2/5 1-3 hours Newbie friendliness 78/100
Maintainers usually reply within 1 day