ucb-bar/chipyard

Integrating Subproject Requirement Documentation

Aberta

#355 aberto em 6 de dez. de 2019

 (0 comentário) (0 reação) (0 responsável)Scala (857 forks)batch import
help wanted

Métricas do repositório

Stars
 (2.255 estrelas)
Métricas de merge de PR
 (Mesclagem média 13d 17h) (4 fundiu PRs em 30d)

Description

As discussed in the main Chipyard meeting, we need to consider some documentation about what rules and requirements there are to participate in Chipyard. And if the rules are not followed, how to get rid of them from Chipyard.

  • What is the threshold for integrating a subproject into Chipyard?
    • Documentation on how to add to a config? what it is?
    • Works with current CI? Must add their own CI?
  • What is the level of engagement in development that we expect from the subproject developers?
    • If main Chipyard devs push something and it breaks the subproject... how fast should the subproject respond?
    • If there is no response, is there a checklist of things that main developers can use to determine if the project can be removed?

Guia do colaborador