help wanted
Métricas do repositório
- Stars
- (1.257 estrelas)
- Métricas de merge de PR
- (Mesclagem média 19h 38m) (1 fundiu PR em 30d)
Description
Our strictness in enforcing being within the 7-day signature validity period interacts badly with skewed clocks. Do we want to encourage signers to pre-date the signature's timestamp by X hours, or require clients to trust signatures that start being valid in X hours, or something else?