bisq-network/bisq

Inconsistent current value is displayed when submitting param change proposal

オープン

#2,644 opened on 2019/04/04

 (7 件のコメント) (0 件のリアクション) (0 人の担当者)Java (1,292 件のフォーク)batch import
good first issuein:guire:usability

Repository metrics

Stars
 (4,505 個のスター)
PR merge metrics
 (PR metrics pending)

説明

When submitting a proposal for changing a phase length, the current value shown is inconsistent with the value shown in the dashboard. There is a technical reason for this, but potentially confusing to the user. The last block is technically part of the phase but for the user we show it as a break and don't allow proposals as the next block for confirmation would be then outside of phase.

Submitting a param change proposal: image

Governance dashboard: image

コントリビューターガイド