help wanted
Repository metrics
- Stars
- (1,257 個のスター)
- PR merge metrics
- (平均マージ 19h 38m) (30d で 1 merged PR)
説明
Our strictness in enforcing being within the 7-day signature validity period interacts badly with skewed clocks. Do we want to encourage signers to pre-date the signature's timestamp by X hours, or require clients to trust signatures that start being valid in X hours, or something else?