ClockGU/clock-backend
Automated break subtraction not valid for vacation shifts
オープン
#435 opened on 2026/01/27
:bug: Bughelp wanted
Repository metrics
- Stars
- (0 個のスター)
- PR merge metrics
- (PR metrics pending)
説明
While automatically substracted breaks (e.g. 30 min after 6h) are not counted as worktime, they appear to be for vacation shifts.
Steps to reproduce
- Set up a contract
- Manually create a vacation type shift from 8:30 until 17:00
- Check the vacation panel in the Report/Timesheet view → 8:30 h of vacation will be shown
- change the shift type to normal → 8:00 will be counted in the worktime summary
Workaround for the time being: clock two separate 4h shifts with a break.