Improve Initial Gem Release Process
#1 373 ouverte le 29 janv. 2025
Métriques du dépôt
- Stars
- (135 étoiles)
- Métriques de merge PR
- (Métriques PR en attente)
Description
We tend to have the same mistakes repeated when releasing new gems. I think we need a linter or guide to help us avoid them in the future.
Our automated release tooling handles versioning. For initial releases this should have been set to
0.0.0The instrumentation generator seeds the version here:
That along with the empty CHANGELOG signals to the release tooling that this specific version will need to be an "initial release" of the gem https://github.com/open-telemetry/opentelemetry-ruby-contrib/blob/main/.instrumentation_generator/templates/CHANGELOG.md.tt
Originally posted by @arielvalentin in https://github.com/open-telemetry/opentelemetry-ruby-contrib/pull/1313#discussion_r1933999091