help wanted
Repository-Metriken
- Stars
- (1.257 Sterne)
- PR-Merge-Metriken
- (Durchschn. Merge 19h 38m) (1 gemergte PR in 30 T)
Beschreibung
Our strictness in enforcing being within the 7-day signature validity period interacts badly with skewed clocks. Do we want to encourage signers to pre-date the signature's timestamp by X hours, or require clients to trust signatures that start being valid in X hours, or something else?