Four verbal commitments to the ACO and the practice with no tracked form (incl. the occupational-clinic opening)
Nobody has claimed this yet.
Assessment
- Difficulty
- 3/5
- Estimated time
- 1-2 days
- Newbie friendliness
- 48/100
- Issue type
- Documentation
- Clarity
- Mostly clear
- Activity status
- Active
- Domain
- documentation
Research direction
Begin with the four commitments listed here, then read ROADMAP §7.1 and LOCKED §4A, decision 6, to preserve the existing dependency and occupational-content status. Done means all four commitments are recorded in a place that is read, the demo scope or prerequisite is visible, and the occupational-health opportunity has an explicit queue decision.
Written by the indexing model from the issue text.
Description
Four commitments were made verbally across the 2026-08-27 and 2026-09-09 sessions and exist in no tracked form. None is code; all four decay silently, which is why they are in one issue rather than none.
- A demo of AI-assisted order-set generation to the ACO. Offered on the 2026-09-09 call. Worth knowing before it is scheduled that the claim as made on the call outruns what ships: AI-assisted CQL authoring from regulation text is real (
ai/ai-assist.ts,measure/measure-authoring.ts, #47), but building an order pick list from value-set membership does not exist —order/order-catalog.tscarries one representative code for cms122 and cms125 and nothing at all for cms130, cms165, cms2 and cms137, and the CDS suggestion path is gated to three approved terminology mappings so neither routed pilot measure produces a suggestion. Either the demo is scoped to what exists, or the pick-list work happens first — and that work is blocked on MIE's order-mapping documentation (ROADMAP §7.1), owed since 2026-08-27. - A follow-up networking call "towards the end of the month."
- An on-site visit in December, with the ACO's operations lead joining.
- Occupational-health collaboration. The ACO runs direct-care and occupational clinics, and named it as an opening. This is the one place where M-E1 — the occupational content pack, deferred behind M-M but explicitly not cancelled (LOCKED §4A, decision 6) — has a named customer rather than a thesis. It is the company's stated long-term differentiator meeting an actual buyer, and it is recorded nowhere.
Owner-ops. Nothing here is buildable; the ask is that the four are visible in a place that is read, so a commitment is kept or consciously dropped rather than forgotten. (4) additionally deserves a decision: it may be worth more than its current position in the queue implies.
Found while re-auditing the four pilot source documents on 2026-09-18.
- Dominant language
- TypeScript
- Stars
- 0
- Forks
- 0
- Avg merge
- 6h 6m
- Merged PRs (30d)
- 69
Contributor guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from Taleef7/workwell
-
documentation owner-ops
Difficulty 1/5 1-3 hours Newbie friendliness 86/100
-
owner-ops
Difficulty 1/5 1-3 hours Newbie friendliness 85/100
-
Difficulty 2/5 1-3 hours Newbie friendliness 76/100
-
Difficulty 5/5 Over a week Newbie friendliness 35/100
-
Difficulty 5/5 Over a week Newbie friendliness 38/100
All issues in Taleef7/workwell
Similar issues
-
Difficulty 2/5 1-3 hours Newbie friendliness 84/100
Eynzof/Hermes-CN-Desktop#610 ·
-
bug clawsweeper:linked-pr-open clawsweeper:needs-live-repro clawsweeper:no-new-fix-pr impact:message-loss issue-rating: 🐚 platinum hermit P2 regression
Difficulty 2/5 1-3 hours Newbie friendliness 78/100
-
enhancement
Difficulty 2/5 1-3 hours Newbie friendliness 68/100
-
calcite-components needs triage refactor
Difficulty 2/5 1-3 hours Newbie friendliness 75/100
Esri/calcite-design-system#15203 ·
-
Difficulty 1/5 Under an hour Newbie friendliness 78/100
fullcalendar/fullcalendar#8106 ·