批准按钮在黑色主题和暗色背景下显示不清
Nobody has claimed this yet.
Assessment
- Difficulty
- 2/5
- Estimated time
- 1-3 hours
- Newbie friendliness
- 65/100
- Issue type
- Bug
- Clarity
- Mostly clear
- Activity status
- Quiet
- Tech stack
- typescript
- Domain
- cli
Research direction
Reproduce the issue by entering plan mode with the Moonshot dark background and black theme, then trace the approval button's styling entry point. Update the text color so it remains readable in this combination and verify the result in the same WSL environment.
Written by the indexing model from the issue text.
Description
What version of Kimi Code is running?
0.23.6
Which open platform/subscription were you using?
Kimi Code (OAuth)
Which model were you using?
kimi-for-coding
What platform is your computer?
wsl windows
What issue are you seeing?
What steps can reproduce the bug?
进入plan mode 设置背景色月之暗面,主题色黑色,即可看到
What is the expected behavior?
字体颜色改成黑色
Additional information
I may help
- Dominant language
- TypeScript
- Stars
- 7.5k
- Forks
- 1.2k
- Avg merge
- 11h 41m
- Merged PRs (30d)
- 345
Contributor guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from MoonshotAI/kimi-code
-
Difficulty 1/5 Under an hour Newbie friendliness 92/100
MoonshotAI/kimi-code#3947 ·
-
Difficulty 2/5 1-3 hours Newbie friendliness 88/100
MoonshotAI/kimi-code#3836 · 2 comments ·
-
Difficulty 2/5 1-3 hours Newbie friendliness 76/100
MoonshotAI/kimi-code#3790 ·
-
Difficulty 2/5 1-3 hours Newbie friendliness 88/100
MoonshotAI/kimi-code#3755 ·
-
Difficulty 2/5 1-3 hours Newbie friendliness 88/100
MoonshotAI/kimi-code#3627 ·
All issues in MoonshotAI/kimi-code
Similar issues
-
Difficulty 2/5 1-3 hours Newbie friendliness 84/100
Eynzof/Hermes-CN-Desktop#610 ·
-
bug clawsweeper:linked-pr-open clawsweeper:needs-live-repro clawsweeper:no-new-fix-pr impact:message-loss issue-rating: 🐚 platinum hermit P2 regression
Difficulty 2/5 1-3 hours Newbie friendliness 78/100
-
enhancement
Difficulty 2/5 1-3 hours Newbie friendliness 68/100
-
calcite-components needs triage refactor
Difficulty 2/5 1-3 hours Newbie friendliness 75/100
Esri/calcite-design-system#15203 ·
-
Difficulty 1/5 Under an hour Newbie friendliness 78/100
fullcalendar/fullcalendar#8106 ·